Intruder and hold-up alarm systems. Commissioning, maintenance and remote support. Code of practice Ingestion-build-51215
$166.00
Description
Intruder and hold-up alarm systems. Commissioning, maintenance and remote support. Code of practice Ingestion-build-51215Draft for Development (DD) 263: 2010 Intruder and hold up alarm systems. Commissioning, maintenance and remote support. Code of practice The commissioning of any intrusion and hold up alarm system (I&HAS) is vital to ensure the system is fully functional. Maintenance of an I&HAS is carried out at the clients premises, and may include remote system checks as part of the overall maintenance program. The purpose of maintenance is to ensure that the
Hazardous situations and fault conditions
Potentially explosive atmospheres - Application of quality systems
Setting drying and cleaning goals (including air quality goals)
It should be used in conjunction with BS EN 61439-1
The immunity levels given for the apparatus will in most cases allow the apparatus to perform as intended in the railway environment
PD IEC/TR 60825-3 is a technical report which gives guidance on the planning and design
Routine tests (production tests)
In particular this document is not designed to assess the electromagnetic compatibility with other equipment
BS EN 806-1:2000 specifies potable water installation requirements and gives recommendations on:
their chemical composition and the temper designations used in this standard are in accordance with BS EN 573- 3 and BS EN 515 respectively
testing and inspection authorities
The requirements for PSL-1 form the basis of BS EN ISO 11961
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.